Updated April 1, 2010.
 The beginning of something better to come.
|
 At the frame shop for straigtening
|
 September 2007 start of restoration
|
 George installing new rear crossmember & tow hook
|
 Rear crossmember & tow hook installed.
|
 Shelby Kirkham heating up rusted u-bolt for removal
|
 George grinding & smoothing front crossmember.
|
 Removing rear axle.
|
 Springs are the only thing left on the frame.
|
 Frame completely striped down.
|
 Frame going for sandblasting.
|
 Frame being painted with new coat of red paint.
|
 Extra frame parts painted red.
|
 Frame being reassembled.
|
 George & the beginnig of frame assembly.
|
 Rear axle reassembled.
|
 Rear axle painted & ready to install.
|
 Rear axle being installed on chassis.
|
 Both axles, crossmembers, muffler, & decals installed on frame.
|
 6 new 24 in. tires & rims installed.
|
 Hall Scott 4 cylinder overhead cam engine matted to 3+2 transmission.
|
 Engine & transmission being dropped into frame.
|
 Hall Scott 4 cylinder & transmission installed.
|
 Cowel being dropped onto frame.
|
 Floor boards being test fitted.
|
 Radiator installed, Cowel being test fitted.
|
 Dash being test fitted.
|
Here is George welding up bottom of seat area and back of cab.
|
1 inch Oak floor installed for cab
|
Wood for back of cab being test fitted
|
|
Doing body work with bondo on rear cab panel.
|
With the body work all done, the rear cab panel is now ready for paint.
|
Roof panel of cab done with bondo, smoothing out the rough spots.
|
Here is Shelby Kirkham cutting off bottom of door, removing rusty panel.
|
Here is the patch installed on bottom of driver door.
|
Damage to left top hood panel
|
Left hood top panel patch being bent and fitted to make the curve around the radiator.
|
Left top hood panel patch being test fitted to radiator.
|
Left hood top panel with new rivets on reinforcement strip.
|
Hood top panel metal work is done and ready for sealer.
|
Center and left hood ready for paint after finish sanding.
|
Right side hood panel ready for next coat of primer.
|
Metal work and straightening has been done to the running board steps.
|
Welding patch on left cab skirt.
|
Picking and filling and bumping out dents on front fenders.
|
Here is Shelby Kirkham laying out some bondo on the cab to running board skirts.
|
Here is George Kirkham repairing left fender.
|
Test fitting of left fender and running board after all metal work had been done.
|
Primer sealer applied to left fender, now ready for finish work.
|
Here is George Kirkham finish sanding of primer on left fender.
|
The front end parts are hung and ready to paint Black.
|
Here's all front end parts, hood, fenders etc. painted Black
|
The hood and fenders painted Black.
|
Fenders and running board skirts awaiting install
|
Here is the Cowel & Windshield removed, now ready for finishing body work.
|
Here is the Cowel being sandblasted.
|
Cowel in primer.
|
Primer being finish sanded on cowel.
|
Test fitting doors to cowel.
|
Small parts for cab painted Yellow.
|
Cab parts hung and ready to paint.
|
Here is George Kirkham painting cab parts Yellow.
|
Major cab parts now in Yellow.
|
Here is the cowel & back pannel in Yellow mounted to chassis.
|
Drivers side view of cowel & pannel mounted on chassis.
|
Here is the roof cab, firewall filler pannels, horn, and oil can installed..
|
Wood pannel for back window and back of cab wood supports installed.
|
International logo installed on radiator and windshield installed.
|
Here is the dash and gauges installed.
|
Headlights, Left Door and Running Board Installed.
|
Right Door and Running Board Installed.
|
Here is the right fender and hood tie downs installed.
|
This is Shelby Kirkham touching up frame paint chips.
|
Cab, fenders and hood all in place.
|
First time out of the shop and under its own power!
| <>
>
Here is George Kirkham standing beside the almost completed 1929 HS54.
|
1929 HS54
|
|